Livee houses are planned in great detail and once ready for production. All we have to do is verify its building site and confirm specific requirements for its installation. Subsequently, we calculate the price, do the necessary design modifications and can start its prefabrication.

The standard construction program for Livee modules is: 2-4 weeks – The selection of specific variants, land assessment, ordering, 8-12 weeks – design, construction management, arrangement of a building permit, assembly on the building site. The constructions duration can vary depending on different variants of Livee dwellings as well as their installed accessories. The final assembly is dependent on the length of the building permit process. Once we have more available detailed information on the offer, we can process design in more detail.[/vc_column_text][vc_column_text]

Selection of a suitable livee …

1. Introductory meeting and clarification of ideas
We guide you through the possibilities of Livee mobile homes and give a standard scope of supply including prices. Based on that, you can think through the various options as well as accessories, you will complete a registration form, which is used to estimate the total price of the house.

[/vc_column_text][vc_column_text]2. Assessment of the suitability of a building lot
Is done either from photographs or by visiting the lot to assess whether the site is suitable for mounting a particular house, and if any special measures will be needed. Access to the land is one of the most important things – if the plot does not allow a truck with a width of and height about 4 m and a crane, we most likely will not be able to deliver the house. Based on this assessment of land we’ll give you a complete quote including earthworks and the foundation of the house. Furthermore we will assess whether the land is suitable for funding through the national subsidy programme.[/vc_column_text][vc_separator style=”dashed”][vc_column_text]

The order…

3. Confirmation of pricing and project documentation We go through the complete project documentation, specifications of materials, colors and finishes and define any potential changes by the client. On this basis, we create a final quote and scope of supply.

[/vc_column_text][vc_column_text]4. Signature of the contract
By signing a contract for work and paying the first advance the process begins – final design works, production in the assembly hall and the process of building permission. Therefore, we ask that you also give us full power of attorney for all necessary legal. Then in only about 12 weeks you will be able to move into your new home..[/vc_column_text][vc_separator style=”dashed”][vc_column_text]

Production and the building permit …

5. Production
The next step is order of all elements of the house and begin with production in the hall. In this section will make complete modules with finishes, as well as ready-tested technologies and all ordered furnishings. Because it all happens in one place, we are able to very efficiently check the quality of execution. This part usually takes 8 weeks.

[/vc_column_text][vc_column_text]6. Building management
Along with the production of the house a building permit is needed or deregistration. This part can be arranged by yourself or you can leave the so called engineering work to us. We arrange all the necessary documents for relevant issues (hygiene, fire protection, water and sewage, CEZ, Telecom) and submit an application for the commencement of construction permit issue. You can usually get a building permit within 8 weeks, thus at the same time as the production of the house. Sometimes, however, this term regretfully stretches.
[/vc_column_text][vc_separator style=”dashed”][vc_column_text]

Building site preparation and installation of the house …

7. Utility runs and excavation works, the foundation of the house Immediately upon release of a positive statement by the Building Authority it is necessary to prepare the site. In particular, the land needs all utility connections (water, sewer, electricity) set up according to project documentation, as well as the installation of ground screw foundations. This preparation can be arranged by us as well as inspections, or you can perform all of this ourselves.

[/vc_column_text][vc_column_text]8. On-site assembly and completion of additional buildings
On prepared land we will bring a fully furnished house and within a few days we will join connections and place the house on its prepared foundations. If any additional structures (terrace, unheated facilities, shed etc.) have been ordered, an additional two weeks are necessary for assembly.
[/vc_column_text][vc_column_text]9. Landscaping
If it is ordered the landscaping will be carried out after the implementation of the house and ancillary buildings.[/vc_column_text][vc_separator style=”dashed”][vc_column_text]

Completion and accommodation …

10. Final inspection and handover for use
Once construction is complete, we perform a final inspection that everything is completed to the required standard and everything works. The house is now ready for approval and use. We prepare a transfer protocol which validates the approval procedure and you can start to live in your new home. At the same time we can train you in the use and maintenance of the house..

[/vc_column_text][vc_column_text]11. Control of functions after 6 months
After 6 months we visit and if anything goes wrong we will rectify it. Otherwise, in case of any problems, a warranty on the structure valid for 10 years and 5 years on technology and surfaces applies.[/vc_column_text][/vc_column][/vc_row]